How does your project look like with BIM and without BIM?

Today most building design processes are digital. A fast-growing part of them is analyzed and automated through BIM. Bottom line: Invert leads through BIM. Remove bottlenecks and deadlines. Massively improve your whole project’s processes through transparency and efficient operations.

With BIM

 

EARLY DETECTION OF INCOMPLETE INFORMATION

Early and timely detection of incomplete information between participants is enabled by sharing and integrating the building information models.

OWNERS INVOLVEMENT

​BIM enables the involvement of the owner/owner’s representative and have them on board throughout the design progress.

ELIMINATES THE LATE DESIGN DECISIONS

Eliminates the late design decisions which results in a waste of time, effort and increased cost.

Clear Linear workflow

More linear process cutting down the time and effort needed through a clear BIM execution plan.

Design optimization

Design optimization in the alternatives of design concepts.

Design optimization

Design optimization in the alternatives of design concepts.

Automated clash detection

Automated clash detection between the MEP, structural engineering, and architectural design teams during the design process.

Automatic cost update

The BIM model includes an updated attribute data for the cost which automatically update through the project progress timeline.

Automatic Project schedules

Project schedules will be updated automatically. Schedules can be provided at any project phase, and also can also be compared to their previous versions.

Project information is always accessible

Project information is always accessible, bridging the gap between the design and construction processes, speeding up the QA/QC process.

up-to-date information for FM

Through the up-to-date BIM model, a facility-management team have access to all relevant information of any project elements (machines, doors, windows, sensors…) that need maintenance.

Optimized Demolition processes

These models offer all information and optimized calculations needed for demolition saving time, cost and effort.

Degital Twin intergration

A BIM model can also offer the basis for generating a digital twin, or an intelligent model that includes real-time operational information of the asset. This enables owners to track data related to building usage, movement of occupants, temperature, and so on.

Without BIM

 

DELAY OF DELIVERABLES

The different participants have to wait for each other’s design completion and planning submissions – one of the main reasons of the delay of deliverables.

Single Page Design

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Information Architecture

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

limited team communication

Iterative loops are a result of limited communication and sharing of information.

No design optimization

No value engineering and design optimization in the alternatives of concepts design.

No design optimization

No value engineering and design optimization in the alternatives of concepts design.

Higher probability of construction errors

Higher probability of construction errors due to manual clash detection, increasing changes, wasting a lot of time and money and delaying deadlines.

Manaul B.O.Q

B.O.Q. can only be provided at the end of the design phase, and increasing mistakes.

Manual PROJECT SCHEDULES

project Schedules can only be provided at the end of the design phase, and will be counted manually and increasing mistakes.

Big gap between the design & construction

providing any of the project information need a lot of communication and by this way the gap between the design and construction is always big.

No connection between planning & FM

Facility management fulfillment is completely separated from the project phases and it requires the whole project deliverables to be reviews and recorded.

Manual calculation for demolition

Manual calculation for demolition is the main reason of increasing the processes work.

No digital twin generation

The 2d drawings are not helpful as a basis for digital twin generation, as there is no any intelligent modeling processes included. 

Our Packages

BIM management.

Set up your project with the required levels of detail, levels of information, with a clear naming convention, whether will be used later on in 4D or 5D phases and facility management will be considered; Setting shared parameters and file divisions, and which drawings will be submitted and in which phases?, with a complete Project coordinate system…and more.

Integrate you office in a full BIM processes.

Setting a complete BIM integration plan and strategic goals can help your team stay on track and have a clear idea of what you want to achieve. These goals need to be specific, measurable, achievable, realistic, and mapped into a timeline. One such goal will be to define success and what that looks like for the whole project phases….and more.

+

Complete 7D BIM

Get the optimum benefits from BIM along the project timeline, starting with BIM management setup, Initial studies, and BIM project setup, to Plans and documentation, Geometric digital modeling, 4D time planning, 5D COST, 6D sustainability, and 7D BIM FM.

Team training Program

Help your team to get an effective knowladge about BIM software, tools, techniques which will ease the internal workflow in the whole project phases, and building constrction cycle. 